Johannesburg Industrial Smelting Workshop Reconstruction
|
Project Type |
Heavy Industrial Building / Smelting Workshop Reconstruction |
|
Location |
Johannesburg, South Africa |
|
Application |
Reconstruction of an industrial smelting workshop for a leading South African industrial company |
|
Project Data |
Steel quantity: more than 5,000 tonnes; maximum individual steel column component: 30 tonnes; maximum crane girder load: 120 tonnes. |
|
FSS Involvement |
Heavy plate preparation, CNC cutting, heavy component fabrication, weld inspection, coating, delivery, and site erection coordination. |
|
Project Highlights |
Heavy steel columns and high-capacity crane girders required controlled plate processing, welding distortion management, accurate end connections, and heavy component handling. |
|
Schedule |
Fabrication duration: 6 months. |
|
Quality Control |
Quality was controlled through a customizable project ITP, with welding inspected to AWS D1.1. Controls covered material documentation, WPS and welder qualifications, fabrication, visual and UT/MT/PT inspection, dimensional checks, coating, marking, and packing release. |
|
Project Status |
Installation completed and facility in operation. |
Project Overview
Located in Johannesburg, this reconstruction project serves the smelting workshop of a leading South African industrial company. The project involved more than 5,000 tonnes of structural steel, individual steel column components weighing up to 30 tonnes, and crane girders with a maximum stated load of 120 tonnes. Fabrication was completed in six months, and the facility has been installed and is now in operation.