Zibo Forest Fire Prevention No. 6 Link Bridge
|
Project Type |
Steel Bridge / Fire Access and Landscape Infrastructure |
|
Location |
Zibo, Shandong Province, China |
|
Application |
Forest fire access and landscape link bridge |
|
Project Data |
Main span: 120 m; bridge width: 6 m; steel quantity: approximately 1,500 tonnes. |
|
FSS Involvement |
Fabrication of large bridge components, workshop assembly, detail control, and component lifting. |
|
Project Highlights |
The 120 m main span and approximately 1,500 tonnes of steel required precise geometry, internal stiffening, and consistent segment interfaces for large curved and box components. |
|
Quality Control |
Quality was controlled through a customizable project ITP to applicable Chinese standards, covering material documentation, WPS and personnel qualifications, fabrication, visual/NDT/dimensional inspection, coating, marking, and packing release. |
|
Project Status |
Completed project. |
Project Overview
The Zibo Forest Fire Prevention No. 6 Link Bridge has a main span of 120 m, a width of 6 m, and an estimated steel quantity of 1,500 tonnes. The project covered fabrication, internal stiffening, workshop assembly, and lifting of large bridge components, demonstrating long-span steel bridge manufacturing capability.

Project Image List






